Culter NurseyDemolition / Soft Strip Package of Culter Primary School, Aberdeen. Works consisted of soft strip of nursery building and annex & demolition of the annex building. Soft strip consisted of asbestos removal (identification / labelled prior to works commencing), removal of partition / wall linings, & ceiling tiles / grid removal. Demolition works consisted of roof removal, walls to annex, internal retaining walls, external walls & floor slab.
-
Poundland ElginDemolition works on the existing Poundland shop, Elgin 161 – 163 High Street. Works entailed a collaborative demolition strategy with the design team and careful consideration for neighbouring properties. Key elements of the demolition were roof removal (connected to neighbouring properties), internal strip out and reclaiming historic materials & removal of large steel beams.
-
Ellon Academy HousingConstruction of a new council housing scheme at Ellon for Main Contractor Bancon Construction. DSC awarded with sub-contractor package for all earthworks, substructures, services, drainage & hard landscaping. Responsible for 12,000m3 of excavated Topsoil’s & Subsoils and subsequent disposals.
-
Donside HousingConstruction of three new flats at Donside, Aberdeen for Robertson Construction. DSC awarded with sub-contract package for all earthworks, substructures, services, drainage & hard landscaping. Works were conducted in close proximity of the River Don & bedding in the construction of the new flats with the existing urban environment.
-
Muir Homes, PeterheadConstruction of a new housing scheme at Peterhead for Main Contractor Muir Homes. DSC awarded with sub-contractor package for all earthworks, substructures, services, drainage & hard landscaping. Responsible for 13,000m3 of excavated Topsoil’s & Subsoils and 34,000m3 of Imported Materials for platforms / roads / formations.
-
Novus Distillery, Grantown on SpeyConstruction of the new Distillery at Grantown on Spey for Morrisons Construction. DSC awarded with sub-contractor package for all earthworks, substructures, services, drainage, concrete work & hard landscaping. Responsible for 46,000m3 of excavated Topsoil’s & Subsoils and 3,000m3 of Imported Materials for platforms / roads / formations.
-
Riverbank Enabling WorksEnabling works package for the new Riverbank Primary School undertaken for Robertsons Construction at Tillydrone, Aberdeen. Works included for the formation of mainline sewers, installation and diversion of Services, bulk earthworks & concrete works. Responsible for 22,000m3 of excavated Topsoil’s & Subsoils and 7,000m3 of Imported Materials for platforms / roads / formations.
-
Inverurie Community CampusConstruction of the new Lossiemouth Highschool for Moray Council as part of HUB Scotland Framework. Main Contractor Robertsons Construction awarded DSC with sub-contractor package for all earthworks, substructures, services, drainage, concrete work & hard landscaping. Responsible for 61,000m3 of excavated soils & import of 20,000m3 of imported materials.
-
Triple Cell Warehouse MulbenConstruction of the new Triple Cell Warehouse for Moray Council. Main Contractor Muir Construction awarded DSC with sub-contractor package for all earthworks, substructures, services, drainage & hard landscaping. Responsible for 42,000m3 of material relocation and 16,000m3 of imported materials.
-
South of the CityConstruction of the new Highschool within Aberdeen as part of HUB Scotland Framework. Main Contractor Balfour Beatty awarded DSC with sub-contractor package for Groundworks & Hard Landscaping. Responsible for 36,000m3 of disposal, 66,000m3 of material relocation and 71,000m3 of imported materials.
-
Torry Academy Demolition AberdeenOperating as principal contractor for Aberdeen City Council to demolish the former Torry Academy. The works involved providing project management for the removal of a variety of asbestos containing materials; complete; processing reuse of site reclaimed materials; removal of all services and grading of the site ready for future development.
-
Academies Demolition AberdeenshireThe demolition of the former academies at Ellon, Laurencekirk and Alford were let as a single contract to be completed over a 6-month period. During the demolition additional asbestos was encountered on all 3 sites. At all 3 sites furniture, equipment and materials were donated to local groups (Men’s Shed, youth clubs etc).
-
Skye, Lochalsh & SW Ross Health CentreNew Health Centre in Broadford, Isle of Skye as part of the HUB Scotland Framework. DSC awarded groundworks package which contains all earthworks, substructure, concrete floors, services, external plant area and final hard landscaping. There was also an existing property that DSC demolished prior to the development.
-
Scottish Fire & Rescue Training Centre PortlethenFormation of a new training facility for the Scottish Fire & Rescue Service within their existing training yard in Portlethen. DSC awarded groundworks subcontract package containing the earthworks, substructure, drainage, floor slabs, services and external slabs.
-
Lossiemouth High SchoolNew High School in Lossiemouth for Moray Council as part of the HUB Scotland Framework. Main Contractor Belfour Beatty with DSC awarded subcontract package containing all earthworks, substructure, concrete floors, services and final hard landscaping. Demolition and asbestos of existing school after handover of the new facility.
-
Baird & Anchor ARI Enabling WorksEnabling works package for the new Baird and Anchor Units undertaken for Grahams Group at Aberdeen Royal Infirmary. Works included the formation of two piling matts, installation of drainage, diversion of existing burn, installation and diversion of services, installation of retaining walls and hard landscaping.