Miltonduff Evaporator

DSC successfully delivered the refurbishment and installation of a new evaporator and bioplant within the existing infrastructure at Chivas Brothers’ Miltonduff Distillery. Initially appointed as Principal Contractor for the enabling works and demolition package, DSC was later engaged by Robertson Construction as subcontractor for the civil engineering scope. Works included installation of the new evaporator and bioplant within existing buildings, construction of a new tank bund, and formation of a new loading bay.